Heavy Lifting
If the load is over 50 tonnes heavy, we define it as
'Heavy Lift'
When we face the challenge of lifting a load of more than 50 tons, we put our team of experts to the task. Typically, there are no standard solutions for lifting such a heavy load.
Therefore, the solution is a collaboration between our sales consultants, engineers and of course the customer to find the most optimal solution.
If you choose us as a partner to find a solution for a 'Heavy lift', the following advantages follow:
Lifting experts
Great know-how in the safe use of lifting equipment since 1969.
Total supplier
Development – engineering – manufacturing – worldwide testing and service.
Extensive documentation
Certification and specifications in accordance with EN Norms, Germanischer Lloyd (GL) & Norwegian Veritas (DNV).
Optimized solutions
Customer-specific product development ensures high quality and time-saving solutions.

The extensive experience in our technical department is a decisive factor in ensuring that the final solution is as user-friendly as possible. At the same time, we ensure that the same advisers are assigned to the task throughout the entire process, from the first meeting to the final test lift.
Do you have questions?
Get a call
Why should you choose us? We help our customers with time-saving solutions where the user is in focus - without compromising on safety
A specially designed lifting tool - that can be ready to lift Transition Pieces (TPs) in under 10 minutes? See the unique and time-saving lifting tool in use by a customer in the video:
See a selection of other 'Heavy Lift' solutions
we have helped deliver:
Since the 1980s, we have developed and supplied lifting and handling solutions for e.g. heavy wind turbine components – both for production, installation and maintenance. With our many years of experience, we are able to solve virtually all challenges in connection with lifting and handling within the wind industry. We have solutions for lifting and handling: Transition Pieces, Nacelles, Towers, and Monopiles Blades.

Hydraulic TP Lifting Tool
Capacity / WLL: 665 T.

Hydraulic Lifting Tool
Capacity / WLL: 250 T. hydraulically adjustable.

Hydraulic TP Lifting Tool
Capacity / WLL: 480 T.

Fast, safe and easy handling of wind turbine nacelles
Fyns Kran Udstyr has developed a hydraulic tool that makes lifting, maneuvering and installation of wind turbine nacelles faster and safer.
Installing wind turbines can be a difficult task without the right equipment, which is where Fyns Kran Udstyr comes into play. The hydraulic tool is adjustable, so the nacelle's center of gravity can be changed and thus fit 100% when the nacelle must be placed on the tower. The tool increases safety, reduces risk and lowers operating costs.
The hydraulic nacelle tool has been developed and perfected over the past 15 years and to date more than 100 tools have been delivered to leading wind turbine manufacturers worldwide.
The yoke tool CE-approved and meets several standards and requirements for safety.
Capacity / WLL: 100 T.
What does a test lift with 900 tonnes look like?
All types of hoisting and lifting equipment must be load tested. This also applies to our 'heavy lift' solutions. In this video you can see one of the TP tools being exposed to the enormous forces that occur when lifting tools like these are tested.
Do you have questions?

